Skip to main content
[Company Phone] [Company Email] | Mon – Sat: 9:00 AM – 6:30 PM

Build Thickness
Compressive Strength
Light Foot Traffic
Surface Finish
Full Chemical Cure
Warranty Term
Engineered Cross-Section

Stratified Layer Schedule

Every FloorSathi installation follows a multi-tier thermosetting matrix formulated for molecular cross-linking between substrate and finish coats.

[Technical specification will be provided by API/CMS]

Substrate Tensile Prerequisite: The base concrete must exhibit a pull-off tensile strength of not less than 1.5 N/mm² in accordance with ASTM D4541.

Substrate Requirements

  • Substrate Moisture Content:
  • Minimum Concrete Grade: M25 / M30 (25 MPa)
  • Surface Profile (ICRI): CSP 3 to CSP 4 (Shot-blasted)
  • Application Temp Window: +10°C to +35°C
  • Relative Humidity (RH): < 85% during laying

Technical Documentation

Download certified laboratory test reports and standard architectural specification sheets.

Application Fields

Recommended Operational Environments

ENGINEERING CONSULTATION

Ready to Transform Your Industrial Flooring Surface?

Book a precision site survey with our certified flooring engineers or request a detailed technical estimate.

Area Calc Quick Quote