Build Thickness
Compressive Strength
Light Foot Traffic
Surface Finish
Full Chemical Cure
Warranty Term
Engineered Cross-Section
Stratified Layer Schedule
Every FloorSathi installation follows a multi-tier thermosetting matrix formulated for molecular cross-linking between substrate and finish coats.
[Technical specification will be provided by API/CMS]
Substrate Tensile Prerequisite: The base concrete must exhibit a pull-off tensile strength of not less than 1.5 N/mm² in accordance with ASTM D4541.
Substrate Requirements
- Substrate Moisture Content:
- Minimum Concrete Grade: M25 / M30 (25 MPa)
- Surface Profile (ICRI): CSP 3 to CSP 4 (Shot-blasted)
- Application Temp Window: +10°C to +35°C
- Relative Humidity (RH): < 85% during laying
Technical Documentation
Download certified laboratory test reports and standard architectural specification sheets.
Application Fields
Recommended Operational Environments